In Fort Mcmurray, Alberta, APM Canada mobilized at Heartland Muskeg River for a hot gas path inspection. The outage lasted from March 27, 2024 until April 15th, 2024 and ended with approximately 4,000 manhours completed with ZERO recordable injuries or quality issues! The team’s dedication to the Live Outage initiative impressed the customer and aided their success.
Read MoreWe are excited and proud to share that APM Boiler has been recognized by The Association of Union Constructors (“TAUC”) for their dedication to safety. Edward (“Ed”) Deitman, APM EHS Manager, was crowned the first ever TAUC Safety Professional of the Year (“SPOTY”) and the APM Boiler division was honored with the Thomas J. Reynolds award!
Read MoreAt Entergy Little Gypsy station in Montz, Louisiana, Steam Fossil performed a HP/IP disassembly from December 1st through December 19th, 2022. They then remobilized on January 3rd, 2023 for the HP/IP Major/Outer Shell Repair and reassembly and a generator rewind. After demobilizing on July 7th, the team revisited the site for the last time on October 4th to finish the generator reassembly and concluded the job scope on November 3, 2023. Throughout the multiple remobilizations, Steam Fossil completed over 45,000 manhours with ZERO recordable injuries or quality events!
Read MoreIn Noblesville, Indiana, APM Gas Power mobilized to respond to an unplanned outage on August 14, 2023. They completed almost 10,000 manhours between their start date in August and their demobilization on December 21, 2023! They also completed multiple scopes of work with zero recordable injuries or quality escapes!
Read MoreIn New Bedford, Massachusetts, APM Renewables supports the onshore portion of the ongoing Offshore Vineyard Wind Project. The Vineyard Wind Project is the 1st offshore wind energy project undertaken in the United States, and APM Renewables is supporting this endeavor every step of the way! Since the start of this ongoing project on August 6th, 2023, APM Renewables has accumulated 9,942 manhours with zero recordable issues, first aid, or quality events, and they continue to deliver excellence while onsite to this present day.
Read MoreAPM Specialty Blade Technicians went above and beyond in their dedication to safety and quality in several Fall 2023 outages. In five separate outages, the Blade Technicians raised multiple Safety and Quality STOP moments that prevented potential damages and protected the safety of the crew and customers. This incredible display of continued diligence ensured 100% safety and quality delivery, avoiding any incidents!
Read MoreAPM Renewables mobilized on August 4, 2022, for the Boott Hydro jobsite in Lowell, Massachusetts where they remain active on site. This outage stemmed from an emergency service call for their assistance in the complete overhaul of two hydro generators, which includes disassembly, rewind, and reassembly. Even while accumulating over 15,300 manhours and counting, the APM Renewables team maintains a 100% safety and quality!
Read MoreFrom April 22, 2023, to April 24, 2023, an APM Electrical team of two superintendents were at the Eagle Valley jobsite in Martinsville, Indiana. Despite their brief time on site due to a lack of parts, the APM Superintendents, Anthony Barton and Tron Wright, managed to impress the customer with their genuine commitment to quality work.
Read More