At Imperial Oil Strathcona Refinery in Edmonton, Alberta, APM Canada mobilized for a Frame 6B Hot Gas Path with Generator Minor Inspection. Over the course of the project, the team accumulated 4,755.5 hours with zero safety or quality incidents!
Read MoreResilience is the ability to quickly recover from difficulties, it is the ability to get up quickly after you are knocked down, it is being tough throughout hardships. We must be resilient and be able to get up after any difficulties we face.
Read More