Posts tagged RISE
APM Fossil North Scores 10 Out of 10!

The dedication of an APM crew is unparalleled. Our APM Fossil North team recently completed a major inspection on the HP/IP (High Pressure/Intermediate Pressure) turbine and a hydrogen cooled generator major inspection at Entergy’s Rhode Island State Energy Center (RISE) in Johnston, Rhode Island.  The APM dayshift crew was led by APM Superintendent...

Read More