Deployed in early November to Missouri for a forced outage, our APM team completed an investigation on a generator bearing that was experiencing high vibration. The team disassembled the generator and supporting components to investigate T-10 bearing and corrected the generator and exciter alignment.
Read MoreIn July, APM Steam reported to International Paper's Ticonderoga Mill site to perform a generator field swap. Our APM Steam team consisted of nine APM Millwrights and three Certified Mechanics per shift at the site.
Read MoreAPM Steam Fossil along with FieldCore, and supporting teams, ventured to ArcelorMittal Burns Harbor Steel Mill located in Indiana, to conduct a bearing inspection. As the team began their routine inspection procedures, removal of the turbine shell led to findings of mass damage that occurred due to high condensation in a steam admission line.
Read More